Dear Value Customers,


Our Data Center Provider will be conducting maintenance on premise electricity infrastructure during the following interval.

Start Date / Time 24th July 2016 0100AM SGT
End Date / Time   24th July 2016 0500AM SGT


Power load from UPS will not be protected and there is a medium risk of power disruption should there be a grid power failure.
In such an event, power will be supplied by genset. However, there will be a time period between ATS switching where power will be disrupted. 

The above is worst case scenario should there be any grid power failure otherwise we should not be expecting any disrruption to the services provided.

Regards SnapsHosting Support Team (A business unit of Genworx Pte Ltd)